SEG Solar to build 5GW vertically integrated manufacturing plant in Indonesia

Facebook
Twitter
LinkedIn
Reddit
Email
Aerial render of SEG Solar's vertically integrated solar PV manufacturing plant in Indonesia
The completion of the first phase of the project is scheduled for Q2 2025 with 5GW of solar cells and 3GW of module annual nameplate capacity. Image: SEG Solar.

Solar manufacturer SEG Solar has signed a land utilisation agreement to build a 5GW vertically integrated PV manufacturing plant in Indonesia.

Construction of the plant will be carried in several phases. The first phase of the project is expected to have an annual nameplate production capacity of 5GW for solar cells and 3GW for modules. The completion date for the first phase is targeted for the second quarter of 2025.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

A spokesperson at SEG Solar told PV Tech the primary focus would be on tunnel oxide passivated contact (TOPCon) technology for the plant in Indonesia, and it might consider heterojunction in the future.

Once fully operational, the project’s total capacity will be 5GW of annual nameplate production capacity from wafers to modules. The vertically integrated plant will be located in the Batang Regency in the Central Java province.

Investment in the solar manufacturing plant will exceed US$500 million and cover over 40 hectares of land.

“Integrated layout across the entire industry chain is crucial for SEG to adhere to legally compliant supply chain standards. Through upstream and downstream coordination, SEG ensures the provision of clean, traceable green products for the markets in the United States, Europe, and Indonesia, thereby facilitating the global transition towards green, low-carbon energy,” said Jun Zhuge, founder and COO of SEG Solar.

Cells produced at the Indonesian plant will supply the company’s global module assembly plant in the US. The company has plants in China, Thailand and the US which is nearly operational.

In its home-country, the company is currently building a 2GW tunnel oxide passivated contact (TOPCon) module assembly plant in Texas which is expected to be operational this year. Last year, SEG Solar completed funding for the module assembly plant with an investment of over US$60 million. The plant is currently on its equipment installation and commissioning phase, a SEG Solar spokesperson told PV Tech.

By the end of the year, the solar PV manufacturer aims to reach an annual nameplate capacity of 5.5GW of modules across its plants.

This is the latest manufacturing development in Indonesia where Singapore-headquartered PV manufacturer Gstar recently started construction on a 3GW silicon wafer plant. The plant is expected to start production by the end of 2024.

Updated on 17 May to add the technology used in Indonesia and update the status of the US module assembly plant.

11 March 2025
Frankfurt, Germany
The conference will gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing out to 2030 and beyond.

Read Next

June 27, 2024
The Asia-Pacific region stands to benefit from localised balance of system manufacturing in its solar industry, the IEEFA said.
Premium
June 27, 2024
Indonesia has the potential to install 3.3TW of solar capacity, according to the government, but several obstacles need to be tackled.
June 26, 2024
Norwegian ingot and wafer manufacturer NorSun has announced a plan to build a 5GW ingot and wafer manufacturing plant in Oklahoma, US.
June 19, 2024
ARENA has launched its global AUS$100 million ‘Solar ScaleUp Challenge’ aiming to stimulate innovation and collaboration in the solar sector.
Premium
June 18, 2024
The two-pronged attack of vastly growing solar capacity and the shift to n-type technologies has converged to make silver a real pressure point for future solar manufacturing.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
July 2, 2024
Athens, Greece
Solar Media Events
July 9, 2024
Sands Expo and Convention Centre, Singapore
Upcoming Webinars
July 10, 2024
9am (BST) / 10am (CEST)
Solar Media Events
September 24, 2024
Warsaw, Poland
Solar Media Events
September 24, 2024
Singapore, Asia