The US has a massive interconnection problem, with more than 14TW of clean power sat dormant in its queues. The DOE i2X initiative is seeking to unleash this power and catapult the US closer to its climate targets. But how will it achieve this? Sean Rai-Roche finds out more.
Cost certainty, reducing wait times and more flexible agreements with utilities are crucial to solving the US’ interconnections problems that are holding the country back from reaching its renewables targets
The US Department of Energy (DOE) has released more details about, and sought more engagement with, its Interconnection Innovation e-Xchange (i2X) programme at RE+ in Anaheim, California.
PV Tech Premium spoke with Lawrence Berkeley National Laboratory (LBNL) about the i2X programme to provide some added clarity on the main challenges the US interconnection system faces.
The US Department of Energy (DOE) has launched an initiative to ease the US’ massive interconnection queues, reduce wait times and lower grid connection costs as it strives to unlock the huge amount of bulk power currently sat dormant in the US.